Skip to main content

Note 1.4.8 - July 2024

  • Phase Change Lines! Whenever the phase (previously called “status” in Note) of a target is updated, a solid vertical line is plotted on the graph on that date. Edit a Phase Change date by selecting the phase change from the target history and adjusting the date.

  • Maintenance targets are labeled in green to distinguish them from active targets (blue) during data collection.

  • Baseline data can be added to behavior objectives.

  • When configuring task analysis targets, the Add Steps page scrolls properly, allowing more than 15 steps can be configured.